Buyers or end users should carry out an on-site acceptance inspection as soon as a wire EDM machine arrives. The step is easily overlooked, yet important: instability and damage caused by mishandling or improper setup are generally outside the manufacturer’s warranty, and a loosely conducted acceptance often leads to disputes over precision later.
1. Seven Checks Before Sign-Off

- Parts. Confirm that the machine’s major components are built as specified in the contract.
- Parameters. Verify that all machine parameters reach the values agreed in the contract.
- Accuracy. Check the machine’s geometric accuracy and positioning accuracy.
- Motions. Test each axis and mechanism to confirm all movements are correct.
- Additional checks. Also inspect areas the contract does not cover; report any dissatisfaction to the manufacturer promptly so it can be improved.
- Trial cutting. Machine a test workpiece and confirm it achieves the required accuracy.
- Records. Complete a pre-acceptance report covering the accuracy results and any requested improvements, and have the manufacturer sign it.
2. Requirements at the Acceptance Site
- Keep qualified technical staff on site when accepting a medium-speed wire EDM (MS-WEDM) machine.
- Set clear requirements for installation, commissioning and machine placement.
- Beforehand, evaluate the manufacturer, verify the machine’s main features and parameters, and validate dimensions and performance on site.
Summary: Acceptance is the decisive step in buying a machine. Working through the seven checks and keeping signed records helps buyers avoid later disputes over precision that arise from careless inspection.